Investor Relations  |  Site Map  |  Contact           
Quality Assurance Terms & Conditions

Please click on the document of your choice.

Code

   Title Code    Title
A General Requirements F Inspection
A01-4 General Requirements Redmond F01-0 First Article Inspection Verification
A02-1 General Requirements Sacramento F02-0 First Article Inspection Report (FAIR)
A03-1 General Requirements Aerojet East F03-0 Source Inspection
A04-0 General Requirements Fire Suppression F04-0 Government Source Inspection
B Quality Management Systems F05-0 Government Quality Assurance
B01-1 Quality Systems AS9100 F06-0 Sampling Inspection
B02-1 Quality Systems ISO9001 F07-0 FAI_Plan Prior to Shipment
B03-1 Quality Systems AS9003 F08-0 PPAP
B04-1 Automotive Quality Systems TS16949 F09-0 Supplier Documentation - Aerojet Prior Approval
B05-0 Aerojet Approved Quality System G Testing
B06-0 Calibration System G01-0 Test Coupons - Supplier
B07-1 Material Integrity System G02-0 Test Coupons - Aerojet
B08-0 Distributors G03-0 Environmental Testing Procedure
B09-0 Configuration Changes G04-0 Chemical Test Actual
B10-1 No Change Policy G05-0 Physical Test Actual
B11-0 Software Control G06-0 Functional Test
B12-0 Obsolescence Management G07-0 Pressure or Leak Test
B13-1 Specifications Standards G08-0 Non-Destructive Test
B14-0 Assembly Configuration & Serialization Log G09-0 Process Sample Evaluation Test
B15-0 Quality System – AS9120 Distributors G10-0 Metallurgical Test
C Process Control G11-0 Environmental Test
C01-0 FOD_FOE G12-0 Chemical Test Typical
C02-0 Lockheed Martin Approval G13-0 Physical Test Typical
C03-0 Supplier Special Process Control G14-0 Electrical Test
C04-0 Supplier Subtier Special Process Control G15-0 Destructive Physical Analysis Test
C05-0 Government Qualified Products List G16-0 N Ray Test
C06-0 X Ray Inspection Plan G17-0 X Ray Test
C07-1 Process Mapping/Manufacturing Planning G18-0 Acceptance Test
C08-1 Statistical Process Control G19-0 Qualification Test
C09-0 Non-Destructive Evaluation G20-0 Supplier Inspection Test Data Report
C10-0 No Glass Beads G21-0 Test Failure Report Control
C11-0 Glass Bead Removal H Packaging/Identification
C12-0 Weld Schedule H01-0 General Packaging
C13-0 Approved Supplier List H02-0 Overseas Packaging
C14-0 Threaded Metallic Fasteners H03-0 O-Ring Packaging
C15-0 Product and Process Control Plan (PPCP) H04-0 Bulk Rubber Insulation
C16-0 Aerojet Furnished Materials/Tooling H05-0 Individual Packaging
C17-0 Aerojet Approval of Tooling H06-0 Special Handling
C18-0 GIDEP Participation H07-0 Hazardous Material and Explosives
C19-0 No Halogenated Solvents H08-0 Ammunication Cards
C20-0 Critical Parts Cycle/Operating Life Hours H09-0 DD250 Form
C21-0 Single Lot Date Code Required I Electronics
C22-0 Shipment in Drums Requirements I01-0 Lead Solderability
D Traceability I02-0 Static Sensitive Material - ANSI/ESD-S20.20
D01-0 Supplier Assigned Serial Numbers I03-1 Tin Content
D02-0 Aerojet Assigned Serial Numbers I04-0 Soldering J-STD-001
D03-0 Traceability to Raw Materials I05-0 Solderability Test Certification 12 Months
D04-0 Drop Ship Material I06-0 Solderability Test Certification 24 Months
D05-0 Material/Component Traceability I07-0 Solderability Test Certification 36 Months
E Certification I08-0 Plastic Encapsulated Devices
E01-2 Certificate of Conformance I09-0 Solder Composition
    I10-0 Rigid PWB Manufacture
E02-0 Stock Item Certification I11-0 Flexible or Rigid-flex PWB Manufacture
E03-0 Shelf Life Requirements I12-0 Microcircuit Manufacture
E04-0 Temperature Sensitivity I13-0 Electrical Test Points
E05-0 Special Process Approval and Certification I14-0 Panel Verification
E06-1 Calibration Certification I15-0 Soldering J-STD-001 Space
E07-0 Seller Controlled Products I16-0 OEM_Authorized Distributor Certifications
E08-1 Heat Treat Time/Temperature Chart I17-0 Recognized Source
E09-0 Raw Material Specifications I18-0 Data Package Requirements for Electronic Components
E10-0 Special Process Certification J Quality Records/Retention
E11-0 Special Process Approvals - Nadcap Only J01-0 Record Retention 10 Yrs
E12-1 Special Process Approval J02-0 Record Retention 15 Yrs
    J03-0 Record Retention 20 Yrs
    J04-1 As-Built Configuration

Click here for the Relational Database (matches the "old" quality note to the "new" quality note).